China PV Cable Routing Clamp - High-Strength Aluminum, Easy Install by Leading Suppliers and Factory
Introducing our innovative quick-install clamp, expertly designed to ensure seamless electrical continuity between rails and structures. This versatile clamp is compatible with leading racking brands and finishes, making it an ideal choice for a variety of applications. As a trusted supplier and factory located in China, we are committed to providing high-quality products that meet your needs while enhancing the efficiency of your installations. Experience the difference with our reliable solutions that combine durability and ease of use
Design Features
- 🛡️ Corrosion-Resistant Hardened Components: Stainless steel contact points resist galvanic corrosion and maintain performance in harsh environments.
- 🔧 Simple Tool Installation: Designed for rapid, secure attachment to rails without specialized tools.
- ☀️ UV & Weather-Resistant Construction: Engineered to withstand prolonged outdoor exposure without degradation over the system's lifetime.
- 🔗 Wide Compatibility: Fits standard solar mounting systems and common grounding cable diameters.
Specification
| Item No | AS-EK-02 |
| Brand | Aisinee |
| Country of Origin | China |
| Material | AL6005-T5 |
| Specs | W44*H14mm, Length: 20mm (customized) |
| Surface Treatment | Nickel Plating |
| Color | Silver |
| Usage | Standing seam metal roof |
| Certificate | ISO / CE / SGS / AS / NZS / JIS / ASCE7-10 |
| Service Life | 25 years |
| Guarantee Period | 20 years |
| Port of Loading | Xiamen Port, China |
| Payment Terms | 100% TT, L/C at sight |
Detail and Assembly Diagram
Accessories of Earthing Kit

Earthing Kit
AS-EK-02
W44*H14mm
W44*H14mm

Lug Body
Connects copper wire to the rail

Piercing Plate
AS-EL-16
Used to penetrate the anodized layer of the rail.
Used to penetrate the anodized layer of the rail.
⚡ Tips: Most aluminum rails have a non-conductive anodized coating. Ensure the lug includes a stainless steel star washer or integrated piercing pins to bite through this layer to reach the raw aluminum.

⚡ Tips: Installation Steps
1
Mounting the Lug to the Rail
Insert the D NUT: Slide the T-bolt into the top or side channel of the aluminum rail.
2
Laying in the Grounding Wire
Place the continuous copper conductor into the lug's wire slot.
3
Post-Installation Checklist — Conductivity Test
Use a multimeter to verify continuity.
Ref Study Case
🔍 Explore Solar Mounting Case StudiesDownload
📄 Download for more detail, including Installation Manual and Product Manual
Packaging and Shipping
| Sales Unit | Per meter / Per pcs | Package Type |
· Inner packing: wrapping paper / film · Outer packing: wooden case |
|
| Lead Time: | ||||
| Quantity (Sets) | 1 – 1,000 | 1,001 – 5,000 | 5,001 – 10,000 | > 10,000 |
| Working Days (UTC+8) | 1 – 7 | 7 – 10 | 10 – 15 | Subject to negotiation |
Frequently Asked Questions
Q What material is the AS-EK-02 earthing kit made of?
The AS-EK-02 earthing kit is made from AL6005-T5 aluminum alloy with a nickel plating surface treatment, providing excellent corrosion resistance and long-term durability in outdoor solar installations.
Q Is the earthing kit compatible with standard solar mounting rails?
Yes. The AS-EK-02 is designed to fit standard solar mounting systems and accommodates common grounding cable diameters, making it widely compatible with most rail-based solar PV installations.
Q How do I ensure proper electrical contact through the anodized aluminum rail?
Most aluminum rails have a non-conductive anodized coating. The earthing kit includes a piercing plate (AS-EL-16) with stainless steel piercing pins or a star washer that bites through the anodized layer to make direct contact with the raw aluminum beneath.
Q What certifications does the AS-EK-02 earthing kit hold?
The product is certified under ISO, CE, SGS, AS/NZS, JIS, and ASCE7-10 standards, ensuring compliance with international solar installation and safety requirements across multiple markets.
Q What is the expected service life and warranty period of the earthing kit?
The AS-EK-02 earthing kit has a designed service life of 25 years and comes with a guarantee period of 20 years, making it a reliable long-term solution for solar grounding applications.
Q What are the available payment terms and lead times for bulk orders?
Payment is accepted via 100% TT or L/C at sight. Lead times range from 1–7 working days for orders of 1–1,000 sets, 7–10 days for 1,001–5,000 sets, and 10–15 days for 5,001–10,000 sets. Orders exceeding 10,000 sets are subject to negotiation.
Get in Touch
You can also contact us via phone, email, or social media, and we will respond as quickly as possible.
Address
Unit 301, No. 600 GuankouSouth Road, Jimei District, Xiamen,China



















