High-Strength Aluminum PV Cable Routing Clamp - Easy Install from China Suppliers & Factory, Compatible with Major Racking Brands
Introducing our Quick-Install Clamp, expertly engineered to ensure seamless electrical continuity between rails and structures. This innovative solution is compatible with leading racking brands and finishes. As a reliable supplier based in China, we take pride in providing high-quality products directly from our factory, ensuring exceptional durability and performance. Optimize your racking system with our clamps, designed to meet the demands of modern installations
Design Features
- ☉ Corrosion-Resistant Hardened Components: Stainless steel contact points resist galvanic corrosion and maintain performance in harsh environments.
- 🔧 Simple Tool Installation: Designed for rapid, secure attachment to rails without specialized tools.
- ☀ UV & Weather-Resistant Construction: Engineered to withstand prolonged outdoor exposure without degradation over the system's lifetime.
- ✓ Wide Compatibility: Fits standard solar mounting systems and common grounding cable diameters.
Specification
| Item No | AS-EK-02 |
| Brand | Aisinee |
| Country of Origin | China |
| Material | AL6005-T5 |
| Specs | W44*H14mm, Length: 20mm (customized) |
| Surface Treatment | Nickel Plating |
| Color | Silver |
| Usage | Standing seam metal roof |
| Certificate | ISO / CE / SGS / AS / NZS / JIS / ASCE7-10 |
| Service Life | 25 years |
| Guarantee Period | 20 years |
| Port of Loading | Xiamen Port, China |
| Payment Terms | 100% TT, L/C at sight |
Detail and Assembly Diagram
Accessories of Earthing Kit

Earthing Kit
AS-EK-02
W44*H14mm

Lug Body
Connects copper wire to the rail

Piercing Plate
AS-EL-16
Used to penetrate the anodized layer of the rail.
⚠ Tips:
Most aluminum rails have a non-conductive anodized coating. Ensure the lug includes a stainless steel star washer or integrated piercing pins to bite through this layer to reach the raw aluminum.

Installation Steps
⚠ Tips:
Follow the steps below to ensure a correct and safe installation of the earthing kit.
-
1Mounting the Lug to the Rail Insert the D NUT: Slide the T-bolt into the top or side channel of the aluminum rail.
-
2Laying in the Grounding Wire Place the continuous copper conductor into the lug's wire slot.
-
3Post-Installation Checklist — Conductivity Test Use a multimeter to verify continuity.
Ref Study Case
📄 Explore Solar Mounting Case StudiesDownload
📥 Download for more detail, including Installation Manual and Product Manual.
Packaging and Shipping
| Sales Unit | Per meter / Per pcs | Package Type |
· Inner packing: wrapping paper / film · Outer packing: wooden case |
|
| Lead Time: | ||||
| Quantity (Sets) | 1 – 1,000 | 1,001 – 5,000 | 5,001 – 10,000 | > 10,000 |
| Working Days (UTC+8) | 1 – 7 | 7 – 10 | 10 – 15 | Subject to negotiation |
Frequently Asked Questions
Q
What material is the AS-EK-02 earthing kit made of?
The AS-EK-02 earthing kit is made of AL6005-T5 aluminum alloy with a nickel plating surface treatment, providing excellent corrosion resistance and long-term durability in outdoor environments.
Q
Does the earthing kit require special tools for installation?
No. The AS-EK-02 is specifically designed for rapid and secure attachment to solar mounting rails without the need for specialized tools, making installation straightforward for technicians in the field.
Q
How does the earthing kit handle the anodized coating on aluminum rails?
The kit includes a piercing plate (AS-EL-16) and stainless steel contact points designed to penetrate the non-conductive anodized layer on aluminum rails, ensuring reliable electrical contact with the raw aluminum beneath.
Q
What certifications does the AS-EK-02 earthing kit hold?
The product is certified to multiple international standards, including ISO, CE, SGS, AS/NZS, JIS, and ASCE7-10, ensuring compliance with global solar installation and safety requirements.
Q
What is the service life and guarantee period of this product?
The AS-EK-02 earthing kit is engineered for a service life of 25 years, with a manufacturer's guarantee period of 20 years, reflecting its high-quality construction and UV/weather-resistant design.
Q
What are the available payment terms and lead times for bulk orders?
Accepted payment terms are 100% TT or L/C at sight. Lead times range from 1–7 working days for orders up to 1,000 sets, 7–10 days for 1,001–5,000 sets, 10–15 days for 5,001–10,000 sets, and are subject to negotiation for orders exceeding 10,000 sets. All shipments are made via Xiamen Port, China.
Get in Touch
You can also contact us via phone, email, or social media, and we will respond as quickly as possible.
Address
Unit 301, No. 600 GuankouSouth Road, Jimei District, Xiamen,China



















