High-Strength Aluminum PV Cable Routing Clamp | Easy to Install | China Suppliers & Factory
Introducing our innovative quick-install clamp, expertly engineered to provide seamless electrical continuity between rails and structures. This product is designed to be fully compatible with major racking brands and finishes, making it an ideal choice for various applications. Sourced from reputable China suppliers and manufactured in our state-of-the-art factory, this clamp ensures durability and reliability for your solar installation needs. Enhance your project efficiency with our top-of-the-line quick-install clamp today!
Design Features
- 🛡️ Corrosion-Resistant Hardened Components: Stainless steel contact points resist galvanic corrosion and maintain performance in harsh environments.
- 🔧 Simple Tool Installation: Designed for rapid, secure attachment to rails without specialized tools.
- ☀️ UV & Weather-Resistant Construction: Engineered to withstand prolonged outdoor exposure without degradation over the system's lifetime.
- 🔗 Wide Compatibility: Fits standard solar mounting systems and common grounding cable diameters.
Specification
| Item No | AS-EK-02 |
| Brand | Aisinee |
| Country of Origin | China |
| Material | AL6005-T5 |
| Specs | W44*H14mm, Length: 20mm (customized) |
| Surface Treatment | Nickel Plating |
| Color | Silver |
| Usage | Standing seam metal roof |
| Certificate | ISO / CE / SGS / AS / NZS / JIS / ASCE7-10 |
| Service Life | 25 years |
| Guarantee Period | 20 years |
| Port of Loading | Xiamen Port, China |
| Payment Terms | 100% TT, L/C at sight |
Detail and Assembly Diagram
Accessories of Earthing Kit

Earthing Kit
AS-EK-02
W44*H14mm

Lug Body
Connects copper wire to
the rail

Piercing Plate
AS-EL-16
Used to penetrate the anodized layer of the rail.
💡 Tips
⚠️
Most aluminum rails have a non-conductive anodized coating. Ensure the lug includes a stainless steel star washer or integrated piercing pins to bite through this layer to reach the raw aluminum.

💡 Tips: Installation Steps
-
1
Mounting the Lug to the Rail
Insert the D NUT: Slide the T-bolt into the top or side channel of the aluminum rail.
-
2
Laying in the Grounding Wire
Place the continuous copper conductor into the lug's wire slot.
-
3
Post-Installation Checklist — Conductivity Test
Use a multimeter to verify continuity.
Ref Study Case
📂 Explore Solar Mounting Case StudiesPackaging and Shipping
| Sales Unit | Per meter / Per pcs | Package Type |
· Inner packing: wrapping paper / film · Outer packing: wooden case |
|
| Lead Time: | ||||
| Quantity (Sets) | 1 – 1,000 | 1,001 – 5,000 | 5,001 – 10,000 | > 10,000 |
| Working Days (UTC+8) | 1 – 7 | 7 – 10 | 10 – 15 | Subject to negotiation |
Frequently Asked Questions
❓What is the earthing kit AS-EK-02 used for?
The AS-EK-02 earthing kit is designed for solar mounting systems to provide a reliable grounding connection between aluminum rails and copper conductors, ensuring electrical safety and compliance with international standards.
❓Does the earthing kit work with anodized aluminum rails?
Yes. The kit includes a piercing plate (AS-EL-16) with integrated pins or a stainless steel star washer that penetrates the non-conductive anodized coating to establish direct contact with the raw aluminum beneath, ensuring proper conductivity.
❓What tools are required for installation?
The AS-EK-02 is designed for tool-free or minimal-tool installation. The T-bolt slides directly into the rail channel and can be tightened with a standard wrench, making the process fast and straightforward on-site.
❓How do I verify the grounding connection after installation?
After installation, use a digital multimeter set to continuity or resistance mode. Place the probes on the rail and the copper conductor to confirm a low-resistance electrical path, ensuring the grounding circuit is complete and effective.
❓What certifications does the AS-EK-02 earthing kit hold?
The product is certified to ISO, CE, SGS, AS/NZS, JIS, and ASCE7-10 standards, making it suitable for solar installations across multiple international markets including Australia, New Zealand, Japan, and the United States.
❓What is the lead time and minimum order quantity?
For orders of 1–1,000 sets, the lead time is 1–7 working days. Orders of 1,001–5,000 sets take 7–10 days, and 5,001–10,000 sets take 10–15 days. For quantities exceeding 10,000 sets, lead time is subject to negotiation. Payment is accepted via 100% TT or L/C at sight.
Get in Touch
You can also contact us via phone, email, or social media, and we will respond as quickly as possible.
Address
Unit 301, No. 600 GuankouSouth Road, Jimei District, Xiamen,China



















