Leave Your Message
PV Cable Routing Clamp - High-Strength Aluminum, Easy to Install |AISINEE
Earthing Kit
Products Categories
Featured Products

PV Cable Routing Clamp - High-Strength Aluminum, Easy to Install |AISINEE

Quick-install clamp designed for seamless electrical continuity between rails and structure. Compatible with major racking brands and finishes.

  • Item No. AS-EK-02
  • Country of Origin China
  • Port of Loading Xiamen Port, China
  • Lead Time 7-15 days for LCL, 20 days for FCL
  • Payment 100% TT, L/C at sight
  • Surface Treatment: Nickel Plating

Design Features

 
● Corrosion-Resistant Hardened Components: stainless steel contact points resist galvanic corrosion and maintain performance in harsh environments.
● Simple Tool Installation: Designed for rapid, secure attachment to rails without specialized tools.
● UV & Weather-Resistant Construction: Engineered to withstand prolonged outdoor exposure without degradation over the system’s lifetime.
● Wide Compatibility: Fits standard solar mounting systems and common grounding cable diameters.

Specification

 

Item No

AS-EK-02

Brand

Aisinee

Country of Origin:

China

Material

AL6005-T5

Specs

W44*H14mm, legth: 20mm (customized)

Surface Treatment

Nickel Plating

Color

Silver

Usage

Standing seam metal roof

Certificate

ISO/CE/SGS/AS/NZS/JIS/ASCE7-10

Service Life

25 years

Guarantee Period

20 years

Port of Loading:

Xiamen Port, China

Payment terms:

100% TT, L/C at sight

Detail and Assembly Diagram

 

Accessories of earthing kit

Earthing kit Earthing lug Piercing Plate

Earthing kit

AS-EK-02

W44*H14mm

Lug Body

Connects copper wire to

the rail

Piercing Plate

AS-EL-16

Used to penetrate the

anodized layer of the rail.

Tips:

Most aluminum rails have a non-conductive anodized coating. Ensure the lug includes a stainless steel star washer or integrated piercing pins to bite through this layer to reach the raw aluminum

aluminum rails Earthing kit

Tips:

Step1. Mounting the Lug to the Rail
Insert the D NUT: Slide the T-bolt into the top or side channel of the aluminum rail.
Lug to the Rail
Step2.Laying in the Grounding the Wire
Place the continuous copper conductor into the lug’s wire slot.
Grounding the Wire
Step3. Post-Installation Checklist Conductivity Test
Use a multimeter to verify continuity.
Solar Panel Roof Rack Brackets

Download 

 
Download for more detail, including Installation Manual and Product Manual

Packaging and Shipping

 

Sales Unit

Per meter/Per pcs

Package Type

·Inner packing: wrapping paper/film;

·Outer packing: wooden case

Lead Time :

Quantity(Sets)

1-1000

1001-5000

5001-10000

>10000

Working Days(UTC+8)

1-7

7-10

10-15

Subject to negotiation